Budget Amount *help |
¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2016: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2015: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2014: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
|
Outline of Final Research Achievements |
1. On a two sample problem with two exponential distributions of which location and scale parameters are unknown, we considered the problem of fixed-width confidence interval estimation of a linear combination of two locations. Given a confidence coefficient and a length of interval, the minimum sample sizes include the unknown scale parameters and so we cannot use them in practice. Thus, by using the three-stage procedures, we gave the asymptotic second-order expansions of the average sample numbers and coverage probability. 2. We considered two exponential distributions with unknown location and scale parameters and investigated the bounded risk point estimation problem of a linear combination of two location parameters. With the risk less than or equal to a given upper bound, the unknown location parameters are included in the optimal sample sizes. Therefore, by using three-stage procedures we provided the asymptotic second-order expansions of the average sample sizes and the risk.
|