Budget Amount *help |
¥3,900,000 (Direct Cost: ¥3,000,000、Indirect Cost: ¥900,000)
Fiscal Year 2015: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
Fiscal Year 2014: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
|
Outline of Final Research Achievements |
The purpose of this study is to evaluate repairing effectiveness of concrete structures deteriorated due to Alkali Silica Reaction (ASR). Modified RILEM AAR-4 Method was proposed. This method is expected to decrease alkali leaching and drying. It is applied to accelerated test of concrete repaired with surface penetrant agent. As a result, it was observed that repairing effectiveness, in some cases, was not found. The reason seemed that water can not be released in the testing container.
|