Budget Amount *help |
¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
Fiscal Year 2015: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2014: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Outline of Final Research Achievements |
The objective of this study is to develop a sheet metalwork and automobile painting learning system for non-experts. As a results, we clarified following learning contents for the learning system. For sheet metalwork, 1)The movie of expert’s sheet metalwork, 2)Work rate, 3) Criterion for hammer and dolly, 4)Grip method for dolly, 5)Hammering position. For automobile painting, 1) The movie of expert’s painting work, 2) Trajectory of spray gun from back and side, 3) Distance between door and body, 4) Spray gun running speed, 5) Angle of axillary and elbow.
|