• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to project page

1991 Fiscal Year Final Research Report Summary

Basic Study on Network control for Expressway

Research Project

Project/Area Number 01550420
Research Category

Grant-in-Aid for General Scientific Research (C)

Allocation TypeSingle-year Grants
Research Field 交通工学・国土計画
Research InstitutionRitsumeikan university

Principal Investigator

MAKIGAMI Yasuji  Ritsumeikan University, Faculty of Science and Engineering, Professor, 理工学部, 教授 (90121615)

Co-Investigator(Kenkyū-buntansha) NAKANISHI Tsunehiko  Ritsumeikan University, Faculty of Science and Engineering Associate Professor, 理工学部, 助教授 (40066725)
Project Period (FY) 1989 – 1991
KeywordsExpressway / Traffic Operation / Detour Guidance / Traffic survey / Floating Survey / Traffic Simulation / Capacity / Traffic Control
Research Abstract

In this study, attention was given to effectiveness of route guidance operations on Japanese expressway network for very heavy traffic congestion in summer vacation period, congestion due to lane drop for maintenance works as well as traffic jams during snow removal operation in winder. The effectiveness of the route guidance operation was evaluated in terms of total travel time on both the expressway itself and detour routes. The travel time an expressways and detour route were estimated from the results of computer traffic simulation and traffic surveys using test vehicles to measure travel time. A 190 kilometer section of the Meishin Expressway from Nagoya and Suita was selected for the traffic survey and computer simulation. Judging from results of investigation, it is confirmed that the detour route guidance operations are effective under following conditions.
i) Length of congested sections of expressway is long enough to burden expressway users with sizable travel time on the exPressway which is longer than that on detour route ?
ii) Detour routes are appropriate for the location and length of congestion on the expressway, and the detour routes have enough capacity to accept the detoured vehicles.
iii) The timing to start and end up the route guidance operation is also appropriate not to cause unnecessary delay obth on expressway and detour route

  • Research Products

    (3 results)

All Other

All Publications (3 results)

  • [Publications] 板井 康人,巻上 安爾,森田 達夫: "名神高速道路における夏期繁忙期の迂回誘導に関する研究" 土木学会年次学術講演概要集第4部. 46. 236-237 (1991)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 巻上 安爾,井上 矩之,三星 昭宏: "交通工学" 理工図書, 217 (1990)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] Y. sakai. Y. Makigami, T. morita: "Study on Detour Guidance in Summer Vacation Season on the Meishin expressway" Proceedings of JSCE Anual Meeting. 236-237 (1991)

    • Description
      「研究成果報告書概要(欧文)」より

URL: 

Published: 1993-03-16  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi