2017 Fiscal Year Final Research Report
Development of Autonomous Distributed Production Scheduling Method for Smart Factory
Project/Area Number |
15K21144
|
Research Category |
Grant-in-Aid for Young Scientists (B)
|
Allocation Type | Multi-year Fund |
Research Field |
Production engineering/Processing studies
Information network
|
Research Institution | Osaka University |
Principal Investigator |
Morinaga Eiji 大阪大学, 工学研究科, 助教 (80432508)
|
Research Collaborator |
NAKAMURA Tomomi
MIYASHITA Ken
|
Project Period (FY) |
2015-04-01 – 2018-03-31
|
Keywords | 自律分散型生産スケジューリング / 優先規則 / 高度分散生産システム |
Outline of Final Research Achievements |
For highly-distributed manufacturing systems, a set of methods of production scheduling have been developed, where scheduling based on priority rules is performed only by message exchanges among facilities and local decision makings in each facility. A method for using the scheduling methods and the highly-distributed simulation method in tandem has been also developed for seamless detailed evaluation of the generated schedule. These accomplishments have realized a new environment of production management, where a planner adjusts the priority rules and the highly-distributed manufacturing system by itself generates a production schedule based on the rules and evaluates the schedule by performing simulation.
|
Free Research Field |
生産システム
|