2021 Fiscal Year Final Research Report
Development of Dyanamic Risk Analysis Methodology Considering Interunit Dependency at Multiunit Site.
Project/Area Number |
18K14157
|
Research Category |
Grant-in-Aid for Early-Career Scientists
|
Allocation Type | Multi-year Fund |
Review Section |
Basic Section 31010:Nuclear engineering-related
|
Research Institution | Hokkaido University (2021) The University of Tokyo (2018-2020) |
Principal Investigator |
JANG SUNGHYON 北海道大学, 工学研究院, 助教 (90782300)
|
Project Period (FY) |
2018-04-01 – 2022-03-31
|
Keywords | マルチユニットリスク評価 / 確率論的リスク評価 / 動的PRA / 人間信頼性評価 |
Outline of Final Research Achievements |
The purpose of this study is to develop a dynamic risk assessment method that considers the inherent impact of a multi-unit system, using a simple plant model for a system with two units, and using an external event (Earthquake). A probabilistic risk assessment for a scenario of Loss of offsite power (LOOP) induced by an earthquake, was carried out considering the impact of multi-unit effects on accident progression. Furthermore, in order to evaluate the consideration of context in human reliability evaluation, which is a problem in the field of the PRA , A new model using Bayesian network and Fuzzy inference to evaluate the effect of environmental changes due to multi-unit effects on human error probability, was suggested.
|
Free Research Field |
原子力工学
|
Academic Significance and Societal Importance of the Research Achievements |
本研究を通し、マルチユニット影響が事故進展に与える影響を考慮し、定量的リスク評価が可能であることを示すことができた。マルチユニットによるネガティブな影響が炉心損傷者放射性物質の放出に与える影響が評価できるようになったことは、大きな成果であると考えられる。機器レベルのモデル詳細化によってマルチユニットシステムの確率論的リスク評価が可能である可能性を示すことができた。さらに人的過誤確率に関するマルチユニット影響を考慮することで、より現実的な人間信頼性評価が可能性について検討することができた。
|