2016 Fiscal Year Final Research Report
Elucidating the mechanism for recovering Knock-on Delay Under High-Frequency Operation and Countermeasures against the Delay in Urban Railways
Project/Area Number |
25420536
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Multi-year Fund |
Section | 一般 |
Research Field |
Civil engineering project/Traffic engineering
|
Research Institution | National Graduate Institute for Policy Studies |
Principal Investigator |
HIBINO NAOHIKO 政策研究大学院大学, 政策研究科, 准教授 (10318206)
|
Research Collaborator |
KARIYAZAKI Keiji (独)鉄道建設・運輸施設整備支援機構
|
Project Period (FY) |
2013-04-01 – 2017-03-31
|
Keywords | 交通計画 / 列車遅延 / 交通政策 |
Outline of Final Research Achievements |
The railway network in Tokyo metropolitan area has been developed to reduce both train congestion and impedance of transfers through providing high frequency train operations. However, small irregularities in services are resulting in significant delays in the railway service, as the railway system is currently operating very close to its capacity. This study focuses on train operation to recover knock-on delay under high-frequency intervals and elucidate recovery mechanism. The study simulates train operations which are not only radial line but also loop line. Finally, the countermeasures against the delay are illustrated based on the results of the train operation simulation analysis.
|
Free Research Field |
土木計画学
|