Budget Amount *help |
¥3,200,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥300,000)
Fiscal Year 2011: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2010: ¥1,900,000 (Direct Cost: ¥1,900,000)
|
Research Abstract |
The natural scene is result of projection of the 3-dimensional world to 2-dimensional plane. This projection is defined by a view point vector. It is called as perspective projection. On the other hand, in the non-perspective projection, visual objects in the scene are drawn from their own vista point. In this project, we formulated the selection and integration perspective based on the probabilistic framework. We proposed the CG algorithm to automatically generate a non-perspective projection.
|