Budget Amount *help |
¥18,460,000 (Direct Cost: ¥14,200,000、Indirect Cost: ¥4,260,000)
Fiscal Year 2014: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2013: ¥11,570,000 (Direct Cost: ¥8,900,000、Indirect Cost: ¥2,670,000)
Fiscal Year 2012: ¥5,460,000 (Direct Cost: ¥4,200,000、Indirect Cost: ¥1,260,000)
|
Outline of Final Research Achievements |
In the seismic retrofit using exterior frame, the connecting member between the low strength concrete structure and the newly added structure is important. The objective of this research is to propose evaluating method of the connecting member. The evaluating method is based on partly experiment focus on shear strength. In two fifths scale frame experiment, proposing method is good corresponding to result with occurring damage at the low strength concrete structure.
|