Budget Amount *help |
¥3,510,000 (Direct Cost: ¥2,700,000、Indirect Cost: ¥810,000)
Fiscal Year 2015: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2014: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2013: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
|
Outline of Final Research Achievements |
In this study, the relationship between longitudinal corrosion crack width at the concrete surface and amount of corrosion of main reinforcement was investigated by accelerated electrolytic corrosion tests on RC specimens with different shear reinforcement ratio. The confinement stress of concrete and shear reinforcements against corrosion expansion was evaluated by conducting an expansion simulation using a non-explosive demolition agent on RC specimens with different cover depth and compressive strength. As a result, it is important to consider the confinement stress for predicting the amount of corrosion of reinforcement from the corrosion crack width. It seems that the proposed model can be evaluated the diameter of corrosion reinforcement under the confinement stress by setting reasonable elastic modulus of corrosion product and taking into corrosion of shear reinforcements.
|